Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 16 results ...

Alkaissy, M, Arashpour, M, Zeynalian, M and Li, H (2022) Worksite Accident Impacts on Construction and Infrastructure: Nondeterministic Analysis of Subsectors and Organization Sizes. Journal of Construction Engineering and Management, 148(06).

Aroke, O, Hasanzadeh, S, Esmaeili, B, Dodd, M D and Brock, R (2022) Using Worker Characteristics, Personality, and Attentional Distribution to Predict Hazard Identification Performance: A Moderated Mediation Analysis. Journal of Construction Engineering and Management, 148(06).

Candaş, A B and Tokdemir, O B (2022) Automating Coordination Efforts for Reviewing Construction Contracts with Multilabel Text Classification. Journal of Construction Engineering and Management, 148(06).

Chen, G, Chen, J, Tang, Y, Li, Q and Luo, X (2022) Identifying Effective Collaborative Behaviors in Building Information Modeling–Enabled Construction Projects. Journal of Construction Engineering and Management, 148(06).

Dou, Y and Bo, Q (2022) Characteristics and Dynamics of BIM Adoption in China: Social Network Analysis. Journal of Construction Engineering and Management, 148(06).

Hussein, M, Darko, A, Eltoukhy, A E E and Zayed, T (2022) Sustainable Logistics Planning in Modular Integrated Construction Using Multimethod Simulation and Taguchi Approach. Journal of Construction Engineering and Management, 148(06).

Jiang, S, Ma, G, Jia, J, Wu, M and Wu, Z (2022) Mobile ICT Overuse in the Construction Industry: Effects on Job Burnout of Project Managers. Journal of Construction Engineering and Management, 148(06).

Liu, G, Huang, R, Li, K, Shrestha, A and Fu, X (2022) Greenhouse Gas Emissions Management in Prefabrication and Modular Construction Based on Earned Value Management. Journal of Construction Engineering and Management, 148(06).

  • Type: Journal Article
  • Keywords: Greenhouse gas (GHG) emissions; Earned value management; Prefabrication and modular construction;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0002268
  • Abstract:
    Prefabrication and modular construction is promoted globally as a sustainable and efficient construction method. The greenhouse gas (GHG) emissions from prefabricated and modular construction have been widely studied and the focus has mainly remained on the measurement of GHG emissions. There has been limited emphasis on the activity-level emission data analysis, and current methods lack a dynamic approach in the analysis of GHG emissions. These limitations contribute to the lack of GHG emissions evaluation and optimization strategies in prefabrication and modular construction projects. To address this knowledge gap, an earned green value management (EGVM) model based on the earned value management theory is developed for setting up a benchmark for evaluating the GHG emissions. Additionally, a two-phase GHG emissions optimization method based on the EGVM model is proposed. This EGVM model and the GHG emission optimization method were applied in a real prefabricated building project. The results demonstrate that this new approach can facilitate GHG emissions management and can improve decision-making in prefabrication and modular construction projects.

Liu, K and El-Gohary, N (2022) Bridge Deterioration Knowledge Ontology for Supporting Bridge Document Analytics. Journal of Construction Engineering and Management, 148(06).

Liu, T, Chong, H, Zhang, W, Lee, C and Tang, X (2022) Effects of Contractual and Relational Governances on BIM Collaboration and Implementation for Project Performance Improvement. Journal of Construction Engineering and Management, 148(06).

Lv, L, Wang, Z, Li, H, Zhang, C and Qiao, R (2022) Tournament Incentive Mechanisms Design for Long-Distance Water Diversion Projects Incorporating Preference Heterogeneity. Journal of Construction Engineering and Management, 148(06).

Shen, K, Li, X, Cao, X and Zhang, Z (2022) Prefabricated Construction Process Optimization Based on Rework Risk. Journal of Construction Engineering and Management, 148(06).

Wang, S, Ni, Z, Qu, T, Wang, H and Pan, Q (2022) A Novel Index to Evaluate the Workability of Conditioned Coarse-Grained Soil for EPB Shield Tunnelling. Journal of Construction Engineering and Management, 148(06).

Yang, Y, Pan, M and Pan, W (2022) Integrated Offsite Logistics Scheduling Approach for High-Rise Modular Building Projects. Journal of Construction Engineering and Management, 148(06).

Zhan, W, Pan, W and Hao, G (2022) Productivity Measurement and Improvement for Public Construction Projects. Journal of Construction Engineering and Management, 148(06).

Zhong, S and Elzarka, H (2022) A Hybrid Grey System Theory–Based Subcontractor Selection Model for High-Stakes Construction Projects. Journal of Construction Engineering and Management, 148(06).